Our reference projects

Our equipment for concrete cooling and concrete heating is in use all over the world. We would like to share some selected examples to give you the best impression of our solutions.
>1000
~50
>2500
~100
20
~100
5

Concrete Cooling & Concrete Heating
Europe

Gotthard Tunnel – SAUTER Heating Systems for the Construction of the Second Tube

More info
KTI - Concrete cooling and heating

Gotthard Tunnel – SAUTER Heating Systems for the Construction of the Second Tube

The Gotthard Tunnel project in Switzerland is one of the most significant and challenging infrastructure projects in Europe. With a length of just under 18 kilometers and its location deep beneath the Gotthard Massif, the construction of the second tunnel poses enormous technical challenges. KTI is proud to make a significant contribution to the successful implementation of this project with its innovative concrete heating systems.

Lorum ipsum dolor sit amet

Grimsel Dam
KTI - Concrete cooling and heating

All-electric—emission-free heating systems

In June 2024, KTI SAUTER delivered concrete heating systems to Airolo. In this project, not only does concrete temperature play a central role, but so does the requirement to supply a system that produces no emissions, since work is being carried out directly inside the tunnel. This necessitated the development of a specially tailored solution.
 
KTI addressed these challenges by developing a fully electric SAUTER concrete heating system, the E-Booster, which operates without emissions while still delivering the necessary heating capacity. These systems ensure uniform heating of the concrete, which is of crucial importance, especially during the critical phases of a construction project. Precise temperature control enables optimal curing of the concrete even under the extreme climatic conditions found in tunnels. The concrete heating system is characterized by 100% all-electric operation, precise temperature control, and modular flexibility. Since construction work takes place directly inside the tunnel, the systems were designed to operate emission-free, meaning they do not release any harmful substances. This ensures that all requirements of the Gotthard Tunnel project are met—both in terms of quality and environmental friendliness. This project impressively demonstrates how KTI supports even the most complex construction projects through innovative technologies. Thanks to our SAUTER E-BOOSTER, we are making a decisive contribution to the advancement of European infrastructure while simultaneously setting new standards for sustainable construction methods.
KTI - Concrete cooling and heating

More information about concrete cooling and concrete heating

Learn why temperature-controlled production of concrete is so important and how our concrete cooling and heating solutions can help you - in concrete quality, production costs and durability.

Concrete Cooling & Concrete Heating
Europe

Concrete Heating Systems for Switzerland's Project of the Century

More info
KTI - Concrete cooling and heating

365 days of temperature-controlled concrete production with KTI's CombiMaster CM50 in Austria

We equipped the concrete batching plant of an Austrian ready-mix concrete company with our CombiMaster to produce high-quality concrete all year round. The limited space at our customer's site was no problem for our very compact design, as the CombiMaster brings a complete cooling and heating system in just one 40-foot container. In addition, we supplied the customer with specially designed air nozzles that were installed in the existing silos.

Lorum ipsum dolor sit amet

Photo: KWO
KTI - Concrete cooling and heating

Specialized Systems for Extreme Temperatures

The Grimsel Dam Project in Switzerland is one of the most challenging and significant infrastructure projects in the Alpine nation. At an altitude of over 1,900 meters, extreme weather conditions are a daily reality during construction. KTI is proud to play a key role in the successful implementation of this project with its innovative SAUTER concrete heating technology.
When construction began in 2019, KTI delivered a SAUTER HWS300 and a SAUTER OLH300 to the Bernese Oberland. The construction of the new dam placed the highest demands on the temperature of the concrete. Due to the extreme ambient temperatures, construction could only take place between May and October, which meant that the correct temperature and the durability of the concrete had to be ensured. Our specialized systems ensured precise temperature control and uniform heating of the concrete, enabling optimal processing even at extremely low temperatures. Thanks to the modular design and quick installation, KTI was able to flexibly adapt the SAUTER heating solutions to the on-site conditions. The high-performance heating systems from KTI SAUTER ensured that the project remained on schedule while simultaneously meeting the high quality requirements. The Grimsel Dam project impressively demonstrates how KTI, using the SAUTER product line, successfully overcomes the challenges of complex construction projects under extreme conditions through innovative technologies and many years of experience. Photos: KWO/Bruno Petroni
KTI - Concrete cooling and heating

More information about concrete cooling and concrete heating

Learn why temperature-controlled production of concrete is so important and how our concrete cooling and heating solutions can help you - in concrete quality, production costs and durability.

Concrete Cooling & Concrete Heating
South America

Concrete cooling and heating for Argentine dam

More info
KTI - Concrete cooling and heating

Concrete cooling and heating for Argentine hydropower project enables year-round mass concrete production

In Patagonia, Argentina, great potential has been identified for hydroelectric power generation as a renewable source of electricity. A major challenge to build the necessary dam structure with high quality mass concrete is the warm summers and cold winters. Therefore, we have provided our customer with a year-round concrete production solution that guarantees a fresh concrete temperature of 10 °C / 50 °F to meet the required quality standards.
SAUTER HWS1000 hot water plant and KTI PLIP120 slab ice plant on MIS23 ice storage and CCWT58 water tank in front of the mixing plant for mass concrete production
KTI - Concrete cooling and heating

Massive components and extreme temperatures

After we delivered our solutions for the production of mass concrete in winter to our customer in Patagonia in the extreme south of Argentina at the beginning of 2020, the delivery of a solution for concrete cooling followed towards the end of the year. The construction of a hydropower plant there requires the highest demands on the temperature of the mass concrete, as extreme ambient temperatures prevail and the durability of the concrete must be ensured. Not for the first time, we were able to convince the customer with our competence and the wide product range of concrete heating and cooling equipment. From a single source, we supplied and commissioned our equipment for year-round concrete production. In order to avoid thermal stress, cracking and unwanted shrinkage, a rule of thumb states that the fresh concrete temperature to be achieved should be equal to the annual average ambient temperature. In this project, the fresh concrete temperature was defined as 10 °C / 50 °F, while the ambient temperature reached 30 °C / 86 °F in summer and was below 10 °C / 50 °F in winter. The total daily production capacity was set at 3,000 m³ of concrete per day.
KTI - Concrete cooling and heating

The details at a glance

10 °C
fresh concrete temperature
3000 m³
Concrete per day
30 °C
At least in summer
5 °C
Maximum in winter
KTI - Concrete cooling and heating

Technical data + installation details

To ensure the required concrete temperature, we supplied a complete solution for concrete tempering consisting of the following components and providing a heating capacity of approx. 4000 kW and a cooling capacity of approx. 1300 kW.
Concrete heating
  • 1x HWS1000 type hot water system
  • 3x clean air silo heater type OLH1000
  • Air nozzles for the silos
  • Insulated air ducts with automatic damper control

Concrete cooling

  • 1x plate ice machine type PLIP120, with integrated ice water cooler
  • 1x MIS23 type automatic ice storage system
  • 1x silo cooling with cold air type CCAP800
  • 1x air purifier / airwasher
  • 1x CCWT58 type insulated cold water tank
KTI - Concrete cooling and heating

More information about concrete cooling and concrete heating

Learn why temperature-controlled production of concrete is so important and how our concrete cooling and heating solutions can help you - in concrete quality, production costs and durability.

Concrete Cooling & Concrete Heating
Europe

Combined heating and cooling plant at Ready-mix concrete plant

More info
KTI - Concrete cooling and heating

365 days of temperature-controlled concrete production with KTI's CombiMaster CM50 in Austria

We equipped the concrete batching plant of an Austrian ready-mix concrete company with our CombiMaster to produce high-quality concrete all year round. The limited space at our customer's site was no problem for our very compact design, as the CombiMaster brings a complete cooling and heating system in just one 40-foot container. In addition, we supplied the customer with specially designed air nozzles that were installed in the existing silos.

Lorum ipsum dolor sit amet

The KTI CombiMaster CM50 has been fully installed in front of our customer's mixing plant. Thanks to its compact design, installation in a limited space was possible at all.
KTI - Concrete cooling and heating

Compact installation makes it possible

In 2021, we successfully installed another CombiMaster CM 50 at a customer in Austria. The requirement was to achieve a fresh concrete temperature from the mixer of 27-21 ° C / 81-70 ° F at an ambient temperature of 30-35 ° C / 86-95 ° F in summer. While in winter 15 ° C / 59 ° F concrete at -10 ° C / 14 ° F ambient temperature is the target. Both temperature requirements are to be achieved with a production capacity of 300-600 m³ / 390-785 yd³ of concrete per day. Specially designed and manufactured air nozzles were supplied by us to the customer and installed in the silo chambers to ensure perfect distribution of hot or cold air through the aggregates and sand. Furthermore, our service technicians installed the air ducts and water pipes. The commissioning of the plant was done in two steps. First for the cooling side before the summer season. Secondly, the heating system was commissioned to make the plant ready for winter concrete production.
KTI - Concrete cooling and heating

More information about concrete cooling and concrete heating

Learn why temperature-controlled production of concrete is so important and how our concrete cooling and heating solutions can help you - in concrete quality, production costs and durability.

KTI – ConTempCo

We are here for you

Contact our experts
Concrete Cooling & Concrete Heating

How would you like to be contacted?

„*“ zeigt erforderliche Felder an

Dieses Feld dient zur Validierung und sollte nicht verändert werden.

Your personal contact to our experts

You wish to be contacted by telephone. Please fill in the following form fields so that we can provide you with targeted support. Thank you

Your name*

„*“ zeigt erforderliche Felder an

Dieses Feld dient zur Validierung und sollte nicht verändert werden.

Your personal contact to our experts

You wish to be contacted by e-mail. Please fill in the following form fields so that we can provide you with targeted support. Thank you

Your name*

„*“ zeigt erforderliche Felder an

Dieses Feld dient zur Validierung und sollte nicht verändert werden.

Your personal contact to our experts

You wish to be contacted in a different way, e.g. by video call. Please fill in the following form fields so that we can provide you with targeted support. Thank you

Your name*